The Challenge
The client faced unexpected structural damage requiring immediate heavy-lifting capacity to prevent a prolonged shutdown.
Our Approach
We fast-tracked the mobilization of two 200t crawler cranes and specialized rigging teams, managing all site permits and transport logistics within 48 hours.